Thread regarding Verizon Communications Inc. layoffs

I WAS WRONG

I was wrong when I said last week that scabs didn't do any engineering work. Turns out one of my jobs was drawn by a contractor. It got FUBAR'd big time. It will take me longer to fix what he did than if I was starting from the beginning. And he probably made $3k for the privilege of F#cking it up.

by
| 1048 views | | 6 replies (last June 10, 2016) | Reply
Post ID: @OP+HPiMnR9

6 replies (most recent on top)

Sounds bad, what did he do? Assigned port 3 instead of port 4 at dropoff?...lol...I could see if as an "engineer" he made an error in a beam load on a bearing wall but let's get real here...lol

by
| | Reply
Post ID: @kyi+HPiMnR9

...and i Failed my Politics exam. The question was "Describe the role that India plays in the modern world".

Apparently "Tech Support" is not the correct answer.

by
| | Reply
Post ID: @ltz+HPiMnR9

Get back to work!

by
| | Reply
Post ID: @qhn+HPiMnR9

Actually, I got closer to $10,000 because I make 4-5x more than union loads.

by
| | Reply
Post ID: @vdl+HPiMnR9

We have been getting scab prints for years. It would be better if they just gave me a blank page, I will draw it up and give it back.

by
| | Reply
Post ID: @bhp+HPiMnR9

You're still lazy scum OP

by
| | Reply
Post ID: @jqs+HPiMnR9

Post a reply

: