I was wrong when I said last week that scabs didn't do any engineering work. Turns out one of my jobs was drawn by a contractor. It got FUBAR'd big time. It will take me longer to fix what he did than if I was starting from the beginning. And he probably made $3k for the privilege of F#cking it up.
6 replies (most recent on top)
Sounds bad, what did he do? Assigned port 3 instead of port 4 at dropoff?...lol...I could see if as an "engineer" he made an error in a beam load on a bearing wall but let's get real here...lol
...and i Failed my Politics exam. The question was "Describe the role that India plays in the modern world".
Apparently "Tech Support" is not the correct answer.
Get back to work!
Actually, I got closer to $10,000 because I make 4-5x more than union loads.
We have been getting scab prints for years. It would be better if they just gave me a blank page, I will draw it up and give it back.
You're still lazy scum OP