So today on 1/31/19 there was a surplus for cad techs (150+) , we are union and support constructing and engineering wire line. In today's phone call it was said due to the new engineering software "aramis" there will be no need for the cad tech position. Yet they offered follow the job to Grand Prairie Texas.
Ok so if the 3rd line said there will be no need for us, why would they keep the position in Grand Prairie. Can they do this?