Anyone have details on why employee move from WEC to Tower in Winston-Salem was abruptly cancelled? Thanks.
10 replies (most recent on top)
Operations would never move to the tower. The rent is higher there.
LC to WEC
Eventually the hubs will go to. Well, not Hudson Yards or Hyderabad, but all the rest.
I heard that the lease at WEC does not end until 2025. The lease at Linden Center ends in 2024 and will move those people first to the tower.
Like many things they did a 1/2 baked job at planning and realized they could do it right away.
More than likely they will sell then building. They are selling all buildings that are not major hub locations.
They are going to layoff WEC employees and transfer the jobs to Des Moines.
Please let them also cancel Fremont employes move to San Leandro. Saul is the bad guy, started all these moves.
“incoming fake alien invasion or climate hoax lockdown will send us all back to WFH by end of this year”
Hoping for both. Either is better than the collaboration hoax or wasting my time and money shuffling into a cubicle plantation where everyone is miserable.
Great question. I'd love to know the answer. It's there anyone in CPG with the integrity to embrace candor and tell us the truth? Knowing that group like i do, I'm not holding my breath.