Thread regarding Wells Fargo & Co. layoffs

25% off staff oversees directive?

Tell me what you know about the directive across control teams to have at least 25% of staff overseas by year end. Anyone else heard this? Came from a leader 3-4 down.

by
| 2566 views | | 17 replies (last April 25, 2022) | Reply
Post ID: @OP+1goUWaLy

17 replies (most recent on top)

Seems like a small percentage

by
| | Reply
Post ID: @2isc+1goUWaLy

Chas e is at 70% offshore and shooting for 80. Considering their failed management is at WF now, you know where they are going with it eventually.

by
| | Reply
Post ID: @2pjo+1goUWaLy

@2ssp, glad to see you're here to oversea all the spelling mistakes.

by
| | Reply
Post ID: @2ttx+1goUWaLy

@OP+1goUWaLy

It’s 25% OF staff for the OP and other University of Phoenix graduates.

by
| | Reply
Post ID: @2ssp+1goUWaLy

Group issue management teams (gim)

by
| | Reply
Post ID: @1ley+1goUWaLy

Wells needs to 0ump the breaks on automation until they come up with technology that can handle it. Auto's push for auto approval is going to bring huge losses because the DOS based systems used are antiquated and unequal to the task.

by
| | Reply
Post ID: @1suz+1goUWaLy

what is GIM?

by
| | Reply
Post ID: @1htl+1goUWaLy

@1jpx, the problem is we keep firing the people who are working to automate things.

by
| | Reply
Post ID: @1cyb+1goUWaLy

This is true. And GIM will be scaled way down says my manager.

by
| | Reply
Post ID: @1plt+1goUWaLy

@1jpx+1goUWaLy this is true of nearly all of the risk, control and testing roles. Our competitors are not spending nearly as much in these areas as we are.

The re-imagine project to essentially strip down all the bloat in the controls and processes that were so poorly designed for long term viability in the TCP work streams will go a long way in producing a reduced headcount. How long it takes them to get that arrival point is the only open question.

by
| | Reply
Post ID: @1ubk+1goUWaLy

Is that raw headcount or effective headcount? If it's effective, that translates to 75% raw. Our group is about 50-50, and I can only name 2 resources who actually do any real work.

by
| | Reply
Post ID: @1gnn+1goUWaLy

What about Gim?

by
| | Reply
Post ID: @1uis+1goUWaLy

I hate to be a jerk but most IT&V should be automated anyway. That’s really the problem. So many processes are so over engineered and manual they’re too expensive to keep onshore and are collapsing under their own weight.

On the flip side, if things were set up as automated with minimal manual intervention you’d probably only need 30% of the current staff to run it.

The bloat has got to go.

by
| | Reply
Post ID: @1jpx+1goUWaLy

30% by the end of 2023 for IT&V.

by
| | Reply
Post ID: @1idz+1goUWaLy

For the person that said their group would be 30%, which type of group are you in? Control management?

by
| | Reply
Post ID: @1yeh+1goUWaLy

eventually 75%

by
| | Reply
Post ID: @yky+1goUWaLy

I didn’t hear that exactly but did see a future projection slide in my group where the graph showed 30% total head count of my group is the goal and we are currently at 17%. This was not discussed. I just caught it during the presentation.

by
| | Reply
Post ID: @adz+1goUWaLy

Post a reply

: