Thread regarding AT&T layoffs

4E Dallas

The current situation for the company pretty much dictates that since the work is not there to sustain a tech or techs, then a headcount reduction is warranted. It's a pretty simple concept and sound business sense. In areas of the country where the volume of work has declined, then adjustments need to be made based on the metrics.

by
| 1352 views | | 16 replies (last April 14, 2022) | Reply
Post ID: @OP+1gccqqIh

16 replies (most recent on top)

Why would there be a 4ESS switch from the 80s in Dallas? The HQ is there. The Ericsson HQ is there. It makes no sense.

Search up watchdog AT&T suite 400. You will see what does make sense.

by
| | Reply
Post ID: @3jas+1gccqqIh

There certainly are a lot of people commenting that have no clue...... I can tell because they have no concept of what class 4 means regarding switching........... and I really don't care if they learn or not......

by
| | Reply
Post ID: @3dbd+1gccqqIh

4ESS is technology from the early 80s if I'm not mistaken because I was at Bell Labs and would see the rooms with the switches...should have been decommissioned already.

by
| | Reply
Post ID: @2qhf+1gccqqIh

4E is not a switch. If you know, you know.

by
| | Reply
Post ID: @2cqz+1gccqqIh

I'm an old codger working the Tandem and I refuse to retire. Why retire? I sit around all day watching the Emergency Action Page & listening for Bo-g Bo-g alarms. Replace circuit packs on occasion & send those packs to repair/return. Best gig ever. Money, benefits, breaks, lunch and a retirement job. Wake me up - I may be in HEAVEN.

by
| | Reply
Post ID: @1brs+1gccqqIh

4E is outdated switch the wirelines, mainly legacy T, uses. If it isn't part of you vocabulary you're lucky because you aren't in the dead end of the business with a bunch of old codgers.

by
| | Reply
Post ID: @1ywm+1gccqqIh

Your surplus papers are in route.

by
| | Reply
Post ID: @1rqr+1gccqqIh

4ESS switch. It is very old technology.

by
| | Reply
Post ID: @1pjo+1gccqqIh

Lucent 5E is where it's at my dude

by
| | Reply
Post ID: @1hmt+1gccqqIh

The lack of knowledge of how the network actually works is disturbing. AT&T needs to cull a lot of employees.

by
| | Reply
Post ID: @1rja+1gccqqIh

Pretty sure OP is referencing the 4ESS switch primarily found in Legacy T central offices throughout the country The company is in a long drawn out process of turning these down. It Bear in mind there’s are switches with approximately 8-10 aisles of eqpt that require 3-4 power plants to operate

by
| | Reply
Post ID: @osy+1gccqqIh

4E should not be a foreign term for any employee of T. Scarry!

by
| | Reply
Post ID: @azu+1gccqqIh

Is 4e the floor your desk is at wtf is 4e english please

by
| | Reply
Post ID: @bgb+1gccqqIh

Is 4E your Boy Scout troop?

by
| | Reply
Post ID: @lhv+1gccqqIh

4E? I need a decoder ring for all these silo acronyms

by
| | Reply
Post ID: @fbw+1gccqqIh

What is 4E?

by
| | Reply
Post ID: @obf+1gccqqIh