Thread regarding Wells Fargo & Co. layoffs

What's going on with the Silas datacenter?

We know only we'll be failing over to BCP for a very long period around the 4th of July weekend because of whatever happened there.

by
| 5916 views | | 17 replies (last June 21, 2021) | Reply
Post ID: @OP+1bmMH5AG

17 replies (most recent on top)

Well, the company could have said that, instead of giving us the mushroom treatment.

by
| | Reply
Post ID: @6ikb+1bmMH5AG

Post ID: @6wbk+1bmMH5AG

Secrecy? It's material information that could be used by hackers to gain access to our systems. If you needed to know, you'd know.

by
| | Reply
Post ID: @6aes+1bmMH5AG

Yeah, when organizations rule by secrecy, backchannels fill the resulting information vaccuum.

by
| | Reply
Post ID: @6wbk+1bmMH5AG

If the company were actually, you know, TRANSPARENT, team members wouldn't resort to using the layoff boards.

BTW, the BCP away from Silas was canceled late last week, without an explanation.

by
| | Reply
Post ID: @6jri+1bmMH5AG

This is 1) not layoff related, 2) not public information, and 3) exposes topology information for no good reason.

by
| | Reply
Post ID: @5kyv+1bmMH5AG

The data lake flooded it :/

by
| | Reply
Post ID: @2kei+1bmMH5AG

All stems back to the fire that occurred at Oxmoor. They keep trying to get items moved from the BCP location at Silas back to Oxmoor through failover events. Thus far they've all "failed". And, whoever said CPG was involved is probably right. They had to redesign some post-fire. I've learned to glance over the emails when I receive them. But, our area is working fine on the BCP server.

by
| | Reply
Post ID: @2ymm+1bmMH5AG

Structural issue? Finally a real answer!

by
| | Reply
Post ID: @1hdn+1bmMH5AG

Correct, apps need to failover to their bcp location between this upcoming weekend and the following weekend so they can address the situation.

by
| | Reply
Post ID: @1nbf+1bmMH5AG

There's a structural issue with the second floor.

by
| | Reply
Post ID: @1dqn+1bmMH5AG

"current skills" strike again!

by
| | Reply
Post ID: @1hzm+1bmMH5AG

LOL @ this site

by
| | Reply
Post ID: @1mmm+1bmMH5AG

@lav+1bmMH5AG

That is backwards. Applications already failed away from Silas. Not all apps use Oxmoor as a backup to Silas.

I know, I was on an EACO line all day putting out fires. Some applications failed back after testing. Others were on an extended stay. Now they are moving back to Silas.

by
| | Reply
Post ID: @1hem+1bmMH5AG

You can now clearly see that none of the posters so far have any idea about what they are talking about. Why provide information then, if this is not accurate? The failover event from Silas to Oxmoor will begin next weekend. Applications will stay in Oxmoor for at least 3 months.

by
| | Reply
Post ID: @lav+1bmMH5AG

Curious. We were told it was related to a "CPG renovation."

by
| | Reply
Post ID: @izj+1bmMH5AG

Nothing. The Silas BCP event has been ongoing for a while now. Apps primary out of Silas were failed to their BCP connectivity. Some were failed over just for a few hours testing, then moved back to Silas that weekend.

Other apps continues to run at their BCP sites and soon be going back to their primary site in Silas.

by
| | Reply
Post ID: @nht+1bmMH5AG

The last exec was fired because their disaster recovery plan was a disaster and never worked.

by
| | Reply
Post ID: @ssx+1bmMH5AG