I’ve been thinking about this topic for a while and want to check my assumptions:
4000 people in this Berkeley Heights building, divided by 8 building sections (1-4 E and W)
= 500 people on each side of each floor, and let’s say 60% are men so 300 men
Stay with me here
60 mins * 8 =480 minutes
480 * 5 men’s bathroom stalls on a given side of a floor (E or W) = 2400 total stall minutes in the work day per building section
Let’s assume everyone needs 6 minutes per day in a stall
300* 6 =1,800
Then let’s assume everyone takes another trip for any reason, most commonly to waste time or exhale
1800* 2= 3,600 total men’s stall minutes needed per section
Yet only 2400 stall minutes per section in a workday
A shortage of 1200 stall minutes for each section
And berkeley heights is pretty good with bathrooms, Alpharetta these numbers would be ever more jarring.
Are my assumptions accurate? Has anyone else thought about this while waiting in line?