Thread regarding Chevron Corp. layoffs

When will Tengiz Chevroil start up the new production.

Cash flow long overdue.

by
| 1423 views | | 3 replies (last June 3, 2024) | Reply
Post ID: @OP+1sOfLuke

3 replies (most recent on top)

It was to happen 2 years ago by now, and every 6 mo the they announced new delays and over run cost. Given that the concession ends by 2033 and the huge overrun cost as of today, they will be lucky to recover only the extra capital. Basically this is a lost opportunity at this point and it is to save face to get it started. Don't dream on it, Chevron is only reliable on not doing things ontime or on budget.

by
| | Reply
Post ID: @2zhc+1sOfLuke

PBF is to offset loss of well productivity. 3GP will add about 300kbpd production (nameplate) assuming no issues.

by
| | Reply
Post ID: @1gce+1sOfLuke

The new production adds nothing, it just replaces steep declines. No cash flow.

by
| | Reply
Post ID: @1qkq+1sOfLuke

Post a reply

: