Thread regarding Imperial Oil Limited layoffs

Operators to control site until 2030 from QP?

I heard the operators will support the site from the control room at QP until 2030.

Like what the fu-k who is going to support when all of them are at Edmonton?

Does anyone have any update?


by
| 2 views | | 2 replies (last 1 day ago) | Reply
Post ID: @OP+1m358pfn0

2 replies (most recent on top)

@OP what site?

by
| | Reply
Post ID: @f5+1m358pfn0

What a mess. It's almost like the entire plan is poorly thought out, inefficient, and makes no sense.

by
| | Reply
Post ID: @aq+1m358pfn0

Post a reply

: