with the unlimited delay of the building 1 into building 2 consolidation the ELT is almost ready to shutdown the Santa Clara Campus. most of netscaler has been moved to china and the SD-WAN product is about to be retired. SD-WAN never worked and business was so small even the sales reps didn't want to touch it.
So 2018 will be last year for the Santa Clara Campus.
Good luck all