What would you say if the grid can’t supply enough power for a second Malta fab.
7 replies (most recent on top)
its a old rocket site .. i bet a nuclear power plant can be built there too
Don’t bad mouth dollar tree like that. Dollar tree stock is up over 90% since the GF ipo.
GF couldnt even manage power dips. , Tools would crash and management would flail around.. GF is the dollar tree of the semiconductor industry.
Not to worry, another GF fab will only get built in Malta if another company takes over FAB8.
The attrition hasn't been this bad since the layoffs for pivot.
The generation grid can support it just fine, it’s the delivery infrastructure that’s in need of upgrades- and it’ll get them when the second plant is ready to build.
As always great forward thinking by our leadership!
https://www.timesunion.com/state/article/globalfoundries-project-brings-load-new-york-s-18677537.php