Thread regarding Union Pacific Corp. layoffs

Precision Scheduled Railroading. Working like a well oiled machine.

engines died and train blocking crossings for damn near 24 hours and didn’t even have a crew rested to go get it. I love it when a plan comes together Unified Plan 2020.

https://www.kwtx.com/content/news/Union-Pacific-train-breaks-down-blocks-crossing-in-Central-Texas-town-567430371.html

by
| 1462 views | | 8 replies (last February 1, 2020) | Reply
Post ID: @OP+13hJhS4L

8 replies (most recent on top)

Executives are triggered and downvoting again

by
| | Reply
Post ID: @1uhm+13hJhS4L

It made the first os. Everything ok

by
| | Reply
Post ID: @ykg+13hJhS4L

Good thing about blocking 3 crossings at a time, we can't get into work. LMAO. Happens 3 days a week in NLR. Build them longer this is fun.

by
| | Reply
Post ID: @zgj+13hJhS4L

Told* dropped two letters on my previous post

by
| | Reply
Post ID: @thj+13hJhS4L

Administered by administration to the people that actually do the work. Nothing but a snake oil salesmen, at this point I think he forgets which lies he’s already to and believes everything he says is truth.

by
| | Reply
Post ID: @gxn+13hJhS4L

Lance said on CNBC a while back all the cuts were administrative.

by
| | Reply
Post ID: @hgo+13hJhS4L

Good thing we did away with maintenance, useless people and wasted money.

by
| | Reply
Post ID: @qll+13hJhS4L

The StraightUp truth is blocking crossings for an entire day with broken down equipment is all part of our Unified Plan 2020 and our desire to build a safer and more efficient railroad.

by
| | Reply
Post ID: @kmq+13hJhS4L

Post a reply

: