3 more Electronics Techs were laid off this morning. More to come today. Also heard they cut the light duty trucks from PE in half just to get guys to quit.
3 replies (most recent on top)
El Reno is laying down Frac crews and the rumor is that 3 more are in the cross hairs to be taken down, but like always el Reno yard does everything in extreme. They took 1/2 of the cement guys stuck them in the pump shop, so in return they found other jobs a buddy of mine told me that cement was running like crazy and he had been up running from job to job for 3 days very little if any sleep. The pump shop is only open mon- Friday day shift only, so if we need any pump parts we are S.O.L. With the rate of ppl getting laid off, fired, transferring, elreno should be slowing things down and re evaluating the situation but nope, they are going to let all the good hands go and keep all the lazy sorry hands like they always do, then the crews that are still in operation are going to loose jobs because of inexperience, and I don't care attitude
You can run a Million dollar plus frac one day and are treated like you can’t tie your shoes the next.
Sad picture that keeps repeating.
They were walking some more people out this morning.